Client
Exxon Mobil
Location
WQ1
Year
Ongoing Since 2018
Exxon Mobil
WQ1
Ongoing Since 2018
Power infrastructure is a critical component of every building project. The size and scope of that electrical infrastructure depend on many factors, such as the building’s footprint, capacity, and intended function.
For this project, the integrated teams at Hybrid Power prepared new building sites for all utility installations including electrical infrastructure.